PHUOC AN BRIDGE EXCEEDS PROGRESS EXPECTATIONS: A TURNING POINT FOR THE NHON TRACH LOGISTICS SUPPLY CHAIN
- 3 days ago
- 2 min read

A Breakthrough Infrastructure Milestone in 2026
The Phuoc An Bridge project—a key transport infrastructure with a total investment of nearly VND 4,900 billion crossing the Thi Vai River—is becoming the focal point of the entire Southern logistics industry. This project is setting a new record for construction speed by continuously recording progress that exceeds expectations.
According to the latest reports, the main span of the Phuoc An Bridge is currently 6 months ahead of schedule. Construction work is being accelerated at full speed, aiming for the closure of the main span over the river by July 2026 and getting ready for technical traffic by the end of this year.
Opening New Trade Routes for Phuoc An Port
With a navigable vertical clearance of up to 55m, ensuring safe passage for large cargo vessels (up to 30,000 DWT) on the Thi Vai River, the completed Phuoc An Bridge will directly transform the region's transport landscape.
Instead of relying on the frequently congested National Highway 51, Phuoc An Bridge creates a direct corridor connecting the Cai Mep port cluster (Ba Ria - Vung Tau) with Dong Nai. This advantage makes Phuoc An Port a highly potential destination. Shipping lines and import-export businesses can berth here, then route goods directly to industrial parks via the Ben Luc - Long Thanh expressway, shortening the road distance by tens of kilometers.

Phuoc An Depot: The Ideal Container Yard Right Next to the Port
With its prime location right next to the port, Phuoc An Depot (operated by Tin Nghia Logistics) naturally becomes the most effective logistics link to catch this massive flow of goods.
The geographical proximity between the port and our container yard provides a closed-loop transport cycle, thoroughly solving the cost puzzle for businesses:

* Optimizing the Import - Export Cycle: Instead of dispatching trucks on long empty runs to Ho Chi Minh City or Binh Duong, customers can now operate a short, efficient cycle right in Nhon Trach:
- For imported goods: Pick up laden containers from Phuoc An Port, deliver to the factory for unloading, and then drop off the empty containers right at Phuoc An Depot.
- For exported goods: Pick up empty containers at Phuoc An Depot, bring them to the factory for stuffing, and then drop them off for international export via Phuoc An Port.
* Increasing Tractor Turnaround Time: Thanks to the empty pick-up/drop-off cycle adjacent to the port and industrial parks, the empty run distance is minimized. Transport fleets can increase the number of trips per day, accelerating cargo clearance and significantly saving fuel and toll costs.
* Professional Container Yard Services: We provide comprehensive solutions from storage, cleaning, and Maintenance & Repair (M&R) to customs clearance support, bringing maximum flexibility and convenience to our partners.
Conclusion

The rapid progress of the Phuoc An Bridge is a solid lever transforming Nhon Trach into the region's new transit hub. Maximizing the "near port, near road" advantage, Phuoc An Depot is committed to providing a safe and professional storage space, accompanying businesses in optimizing costs at every link of the supply chain.

Comments